Skip to main content Skip to footer

Click to learn more about this service alert: All Routes 9/20/26 Alternate Lineup. Extreme Delays  Detour In conjunction with the Toledo Garmin Marathon, it has become necessary to create a detour and have an alternate line up. Extreme Delays/All routes will line up on the inbound side of Greenbelt Parkway in between Lagrange St. and Cherry St. Details at TARTA/garmin26

Click to learn more about this service alert: Service change begins Sunday, September 20.   Modified Service To continue to improve service, there will be a service change with small time changes to several routes on Sunday, September 20, 2026. Route 5 will end at Walmart and no longer service Flower Hospital. Route 2 will join line up at the top and bottom of the hour Mon-Fri 6a-6p. https://tarta.com/media-center/service-change-september-20-2026/

Click to learn more about this service alert: 15 Detour revised 08/24/2026  Construction Detour Due to a water line project on Summit between New York and Galena a detour will be necessary. Inbound= Via Summit to Pontiac (R), Erie (L), Columbus (R), Chase (L), Galena (L), Erie (R), back to route. / Outbound= From Erie to Galena (L), Chase (R), Columbus (R), Erie (L), Pontiac (R), Summit (L) back to route.

Click to learn more about this service alert: 18 Detour Delaware  Construction Detour Due to a forming sink hole at Delaware Ave. and Parkwood Ave, it has become necessary to create a detour.. Inbound= Central Ave. to Collingwood Blvd (R), Delaware (L) back on route./ Outbound= Collingwood Blvd (R) Central Ave. (L) back on route.

Click to learn more about this service alert: 33 Detour Junction  Construction Detour Due to work being done on the church at Nebraska and Junction it is necessary for a detour for 33 IB from Detroit to Indiana R to back on route OB Indiana to Detroit L to back on route

Click to learn more about this service alert: APT SIDE LINE UP CHANGE begins Monday 7-13-26  Construction Detour Due to Sidewalk construction, the APT side lineups will be moved to Superior. Routes 15, 16, 18, 22, 26, 33 & 34

Click to learn more about this service alert: 10 Detour Glenwood: Outbound Regular Route  Construction Detour Inbound= From 795 to Lime City (L) continue on Lime City back to route. Outbound= Regular Route

Click to learn more about this service alert: Stops in Constructions Zones  Construction Accessibility Issue TARTA does not pick up or drop off in construction zones, or in bus stops with traffic cones in the road.

Click to learn more about this service alert: 33 Detour Arlington  Construction Detour 33 Inbound= Via Detroit, South(R), Spencer (L), back on route. / 33 Outbound= Via Spencer, South (R), Detroit (L), back on route.

Click to learn more about this service alert: Bus stops on detour  Stop Moved Bus stops closed because of detours will be flag down service on the detour route.

Manufacturing

Known as the “Glass City,” Toledo has a rich history in manufacturing, from automotive production to glass and steel industries. The city remains a hub for industrial innovation, supporting advanced manufacturing, aerospace, and renewable energy sectors. With a skilled workforce and strong infrastructure, Toledo continues to drive economic growth and technological advancements in manufacturing.

Image for the Point of Interest GM Powertrain

GM Powertrain

GM Powertrain in the region plays a critical role in producing and advancing vehicle engines and drivetrains. As part of General Motors' operations, it drives innovation in automotive manufacturing, creating jobs and contributing to the local economy and technological advancement.

1455 W. Alexis Rd., Toledo, Ohio 43612

Empowering people to make connections.?

By proceeding, you acknowledge that you have read and agree to our Privacy Policy and Terms of Use.