Skip to main content Skip to footer

Click to learn more about this service alert: 33 Detour Adams  Construction Detour Due to construction, a Detour is needed for the: 33 line Detour OB: Jackson to Michigan left to Adams to regular route. IB: Adams left to Erie to Cherry right to Superior right. Bus Stops Affected: OB, 1 IB, 1 Beginning: 10/26/2026 Duration; 3 days Extra Milage; OB +.50 IB + .51

Click to learn more about this service alert: 20 Detour Adams  Construction Detour Due to construction, a Detour is needed for the: 20 line Detour OB regular route. IB: Adams left to Erie to Jackson right to Huron Left. Bus Stops Affected: OB, 0 IB, 1 Beginning: 10/26/2026 Duration; 3 days Extra Milage; OB +. IB + .25

Click to learn more about this service alert: 18 Detour Delaware  Construction Detour Due to a forming sink hole at Delaware Ave. and Parkwood Ave, it has become necessary to create a detour.. Inbound= Central Ave. to Collingwood Blvd (R), Delaware (L) back on route./ Outbound= Collingwood Blvd (R) Central Ave. (L) back on route.

Click to learn more about this service alert: 33 Detour Junction  Construction Detour Due to work being done on the church at Nebraska and Junction it is necessary for a detour for 33 IB from Detroit to Indiana R to back on route OB Indiana to Detroit L to back on route

Click to learn more about this service alert: 15 Detour Chase Pontiac revision   Construction Detour Due to a water line project on Summit between New York and Galena a detour will be necessary. (Update due to Erie closing): Routes Affected 15 Detour Inbound= Via Summit to Pontiac (R), Chase (L), Galena (L), Erie (R), back to route. Outbound= From Erie to Galena (L), Chase (R), Pontiac (R), Summit (L) back to route.

Click to learn more about this service alert: 34 Detour Sherwood  Construction Detour Due to construction, a Detour is needed for the: 34 line Detour OB regular route. IB: Detroit to Sherwood right to Anthony Wayne Trail left to Glendale left to Detroit right to regular route. Bus Stops Affected: OB, 0 IB, 2 Beginning: 10/21/2026 Duration; unknown Milage change +1.42

Click to learn more about this service alert: APT SIDE LINE UP CHANGE begins Monday 7-13-26  Construction Detour Due to Sidewalk construction, the APT side lineups will be moved to Superior. Routes 15, 16, 18, 22, 26, 33 & 34

Click to learn more about this service alert: 10 Detour Glenwood: Outbound Regular Route  Construction Detour Inbound= From 795 to Lime City (L) continue on Lime City back to route. Outbound= Regular Route

Click to learn more about this service alert: Stops in Constructions Zones  Construction Accessibility Issue TARTA does not pick up or drop off in construction zones, or in bus stops with traffic cones in the road.

Click to learn more about this service alert: 33 Detour Arlington  Construction Detour 33 Inbound= Via Detroit, South(R), Spencer (L), back on route. / 33 Outbound= Via Spencer, South (R), Detroit (L), back on route.

Click to learn more about this service alert: Bus stops on detour  Stop Moved Bus stops closed because of detours will be flag down service on the detour route.

TARTA Rolls Out ATU-Endorsed Apprenticeship Program

TARTA took the next step in its investment in its team and training for its operators with the unveiling in late September of an operator apprenticeship program endorsed by the International Amalgamated Transit Union. 

Fixed route operators who graduated last month are the first to will be the first class in this new program - the 10th ATU-endorsed apprenticeship program in the U.S. and the first in Ohio. 

ATU apprenticeship programs are designed to go beyond standard onboarding programs, with curriculum that includes paid training for a Commercial Driver’s License (CDL), peer mentorship, certifications and an enhanced curriculum covering safety and de-escalation tactics.

New TARTA operators undergo 300 hours of instruction time, split between classroom training and road training. The apprenticeship program with the ATU is in addition to TARTA’s M-PACT Program, which matches new operators at TARTA with experienced operators to help guide them through the first years of their career.

Congratulations to all of September's graduates:

  • Curtis Emerson, Fixed Route
  • Alina Ligon, Fixed Route
  • DeWanna Lindsey, Paratransit
  • Jacquelyn Patton, Fixed Route
  • Richard Perry, Fixed Route
  • Iesha Smith, Fixed Route
  • Shawn Walters, Paratransit

TARTA was proud to welcome a number of special guests to help celebrate the occasion, including:

  • International ATU Director of Apprenticeships and Workforce Development Jamaine Gibson 
  • International ATU Vice President Carly Allen, who served as a TARTA Operator for 20 years and President of ATU Local 697 for 12 years before being elected to that post
  • Ohio State Rep. Erika White

About the author

TARTA

Empowering people to make connections.?

By proceeding, you acknowledge that you have read and agree to our Privacy Policy and Terms of Use.